Our To-Do-List
 
PROJECT STARTED COMPLETED
DONE  Carbon Monoxide/Smoke Detectors   10/15/06
DONE  Install DSL & offer free WiFi   12/15/06
DONE  Replace Beds Deliver 10/14/06 10/22/06
DONE  Upgrade beds in Cabins 1 and 2 from Full to Queen Deliver 10/14/06 10/22/06
DONE  1 New Futon for each cabin Deliver 10/14/06 10/22/06
DONE  New Motion Sensor Dimming Porch lights   10/22/06
DONE  New Bedding Ordered 10/3/06 10/22/06
DONE  New Cooking Utensils and Pots & Pans   10/22/06
DONE  Live Remote Web Camera w/ Streaming Video Ordered 10/24/06 11/04/06
DONE  New Roofs on Cabins 1 & 2 Ordered 11/3/06
11/06/06
DONE  New Stoves and Refrigerators for each kitchen Ordered 11/06/06 11/11/06
DONE  Trash Dumpster Ordered 11/20/06 11/24/06
DONE  Remove old office and single-wide trailer 11/30/06 12/5/06
DONE  New Dining Table & Chairs (Cabin 1 & 2)   12/15/06
DONE  Window Valances   12/15/06
DONE  Designated Camp Fire area #1 (upper park)   12/27/06
DONE  Designated Camp Fire area #2 (lower park)   01/03/07
DONE  Rock Walk Ways from parking to (Cabins 4 and 5)   01/03/07
DONE  Windows Blinds for kitchens in (Cabins 3-4 and 5-6)   01/04/07
DONE  Digital Thermostats for all cabins and Motel Rooms   01/04/07
DONE  TV's with DVD Players in Cabins 1 thru 6   02/03/07
DONE  All New Window Blinds in Cabins 1 thru 6   02/03/07
DONE  Medicine Cabinets and Additional Shelf in (Cabins 1 & 2)   02/03/07
DONE  Oak Bath Fixtures, towel racks...  (Cabins 1,2,3,5,&6)   02/03/07
DONE  New Window Blinds in (Cabins 1 & 6)   02/10/07
DONE  New Shower Unit in Cabin 5 02/24/07 02/25/07
DONE  Replace Broken Windows in  Cabins 1 & 2 02/17/07 02/17/07
DONE  Remodel Kitchen/Dining Area in Cabin 3-4 03/14/07 03/14/07
DONE  Removed abandoned Granada 03/31/07 03/31/07
DONE  Removed old ice box and pile of pipe and antenna's 04/01/07 04/01/07
DONE  Remodel Bath House for RV'ers 03/31/07 07/13/07
DONE  New Carpet in All Cabins   04/02/07
DONE  Make #6 Wheelchair Accessible   08/16/07
DONE  Remodel Motel #7 08/06/07 08/10/08
DONE  Flower beds around Home/Office for my wife 03/06/08 05/01/08
DONE  Flattened out RV K and made it longer 10/15/07 10/16/07
DONE  Installed water tank to catch rain water 07/06/08 07/06/08
DONE  Futon/Bunk Bed in Motel #9 08/01/08 08/05/08
DONE  New Sheets, that fit,  on on all Queen Beds 08/06/08 08/10/08
DONE  Solar powered LED Flood lights for main sign 08/06/08 08/06/08
DONE  Burned brush pile at top of property 08/15/2008 08/18/2008
DONE  We out-grew the power service we had one 200 amp meter feeding the entire place!!!  The Co-op is installing (3) 200 amp services, and a Transformer to meet the demand. 

Note; the park has survived on 200 amp since the 70's.  Within 1.5 years of us buying the place, not to mention the work I have done, the demand was just too great!!  (I just hope I have more problems like this.)

08/01/2008 10/09/2008
Paint Cabin Trim    
DONE  New Queen Size Pillows on all Queen Beds 08/14/08 08/14/08
DONE  Repaired Culvert at entrance 08/18/08 08/18/08
DONE  Hired Professional Cleaning Crew 08/01/08  
DONE  Pruned Tree blocking some of the view from Pavilion 09/20/08 09/20/08
DONE  Installed small light for the stoves in #1 and #2   09/25/08
DONE  Removed gravel that built up at the entrance to improve traction.   11/6/08
DONE  Repaired the edge of the entrance that washed out   11/6/08
DONE  Now offering DVD Rentals   11/11/08
Applied for Solar Power, but have 2 yr wait list 11/13/07 Didn't Happen :-(
DONE  Stripping then Painting white trim on Cabins 3, 4, 5, and 6, going with a forest green. 05/13/09 05/15/09
DONE  Install 3,000 gal water tank and filters.   07/14/09
DONE  New gravel in RV L.   07/14/09
***JUST ENTERED or 1,000th reservation***   08/07/09
DONE  New Door Bell (phone) that will call me no matter where I am.   08/07/09
DONE  Microwaves in all of the cabin kitchens.   09/22/09
DONE  New Porch Swing near Pavilion 04/20/10 4/25/10
DONE Back-up generator for Motel Rooms   05/07/10
DONE  New Front Loader Washing machine in Laundry Room 04/22/10  
DONE  Dish Network in all Cabins and Motel rooms 05/19/10 05/25/10
Electric Meters on RV Spots 05/01/10  
DONE Back-up generator for Cabins 1 & 2   08/30/10
DONE New bedding for all the Full Size beds 08/29/10 09/09/10
DONE Additional fleece blankets for all beds and Futons 08/29/10 09/09/10
DONE Replace missing items from units with kitchens 08/29/10 09/09/10
DONE Painted Windows & Trim on Cabins 1 & 2 12/15/10 12/18/10
DONE Made the commode level in Cabin 6. (seem odd to list that, but did it.) :-)   03/11/10
DONE New shower floor in Cabin 6   03/10/11
DONE New low flow commodes in Cabin 5 & 6   03/12/11
DONE Installed Rail Road Ties for RV B, now about 3' wider   09/25/10
DONE Back-up generator for Cabins 3-4 & 5-6 03/18/11 03/25/11
DONE Back-up generators for ALL Cabins and the Motel Rooms.   03/25/11
DONE Replaced stairs on the Pavilion   07/03/11
DONE Installed Rail Road Ties for RV A, now about 3' wider   07/10/11
Painting entry porches, door trim, and doors 12/12/11  
DONE Replaced flooring in Cabin 5 bathroom 12/05/11 12/05/12
DONE Replaced stairs for Cabin 4 12/09/11 12/09/12
DONE Replaced stairs for Cabin 5 12/10/11 12/10/12
DONE  Install range hoods with light & filter for the cabin kitchens. Now you can see what you're cooking.
01/9/12 01/18/12
DONE Install Tankless Water Heater for Motel Rooms 02/07/12 02/08/12
DONE Install chair height commodes in 3-4 & 5-6   04/23/12
DONE Install large attic vents in 3-4 & 5-6   04/25/12
DONE Install large attic vents in 1 & 2   06/25/12
DONE All new Patio Tables and Chairs for Pavilion.  Seating for 28 now, and looks great too! (previously, seating for 16)   07/02/12
DONE New bathroom linens   07/15/12
DONE Paint old rusty corrugated steel roofs on 3-4 & 5-6   07/25/12
DONE Paint log siding on 3-4 & 5-6 (the roof looked so good)   07/26/12
DONE Paint log siding and trim on the Motel Room building   10/15/12
DONE New flooring in Cabin 1 bathroom   12/15/13
DONE Removed that ugly stucco building above the motel     rooms, to bring in a small double wide for my Dad to live in. 04/06/13 04/27/13
DONE New Shower in Motel #7   06/09/13
DONE Air Conditioning unit in Motel #7   06/10/13
DONE Air Conditioning unit in Motel #8   06/25/13
DONE New Shower in Motel #8   07/05/13
DONE Air Conditioning unit in Motel #9   07/15/13
DONE Replaced Carbon Monoxide/Smoke Detectors
           (Manufacturers recommendation)
  11/22/13
Install screen doors on cabins 3-6 and the motel rooms too Before Summer '13 Opps, falling behind schedule
Paint Log Cabins 1 & 2 Soon  
DONE Installed Conventional Water Heater for the Motel Rooms.  Tankless Water Heater was a FAIL. 02/14  
DONE Went to Tennessee and adopted or daughter! 03/11/14 05/05/14
DONE Remodel Cabin #1 Bathroom, ripped entire shower out 09/06/14 09/19/14
DONE Remodel Cabin #2 Bathroom, ripped entire shower out 09/22/14 10/02/14
DONE New Fireplace Hearths in Cabin #3 12/09/14 10/16/14
DONE New Fireplace Hearths in Cabin #6 12/09/14 10/16/14
DONE Flat screen LCD TV #3   12/09/14
DONE Flat screen LCD TV #6   12/09/14
DONE Double Sided Wall Heater in Cabin #1, to heat the bedroom too.   01/27/15
DONE Heavy Duty 6 Leg Bed Frames for Cabins 3 thru 6.   03/18
SOON New Pillows for all the Cabins & Motel Rooms   3/21/15
DONE New Maid Service, she is awesome! 3/15 3/15
DONE Deck Railing and Banisters for the Pavilion Deck   3/21/15
DONE Double Sided Wall Heater in Cabin #2, to heat the bedroom too.   12/21/15
DONE Replacing shower floor and surround in Cabins  3 & 4, level the floor up, and install bead board on the sink and shower walls.   03/15
DONE Replacing shower floor and surround in Cabins  5 & 6, level the floor up, and install bead board on the sink and shower walls.   04/15
DONE Replaced steps and bad railing to the Motel Rooms and paint rails and posts   05/16
My Dad was Diagnosed with Bladder Cancer Early May 2017, and I was his Care Giver.  Then he passed away July 2017.  It was hard to get get anything done during that time, and many months after that.  So I didn't ge7 much accomplished in 2017. 05/03/2017 11/17/2017
DONE Added Cabin 11, 3 Bedroom, 2 Bath, and Sleep up to 10   12/17
DONE New Horse Shoe Pits   07/03/18
DONE New 13'x13' flat Communal Fire Pit Area. 07/16 07/11/18
     
     
Miscellaneous trivia;

We filled (3) 30 Yard Construction Dumpsters with "Stuff", for a total weight of 9.6 tons in the first 12 months. (That doesn't include the old beds or old appliances that we gave away to charity.)

We have also hauled away 4 dead refrigerators , 15 car batteries, (2) cars, Commercial Ice Box, and (2) 55 gallon drums filled with used motor oil and vegetable oil.  (don't worry, it was all disposed of properly)